From Canton Fair to Hospital: A Successful Power Project in Indonesia
2026/11/19
The 140th Canton Fair, held last month, is often the starting point for long-term international partnerships. This is the story of how a brief meeting at our booth in October 2026 evolved into a successful emergency power project for a hospital in Indonesia.
During the fair, we met Mr. Budi, an infrastructure contractor from Indonesia tasked with upgrading the backup power system for a major hospital in a remote region where the local grid is notoriously unstable. The hospital's existing brushed generators had repeatedly failed due to voltage fluctuations and frequent start-stop cycles, putting critical patients at risk. Mr. Budi needed a generator that was exceptionally reliable, low-maintenance, and capable of providing stable power within seconds.
We immediately identified the solution: a customized 250kW brushless AC generator equipped with an advanced AVR and a smart control panel. The brushless design eliminates the friction and wear of carbon brushes, making it perfect for frequent cycling—a must-have for hospital emergency power. The advanced AVR ensures voltage remains perfectly stable, preventing surges that could damage sensitive ICU equipment.
Following the fair, our engineering team worked closely with Mr. Budi to finalize technical specifications. We provided detailed 3D drawings and customized a weatherproof enclosure for Indonesia's tropical climate. Within just three weeks after the fair, the generator was manufactured, tested, and shipped to Jakarta. We recently received confirmation that it has been successfully installed, now serving as the hospital's primary backup power source. This project demonstrates our ability to turn Canton Fair connections into real-world solutions. Contact WERNA today to discuss your project requirements.